grand dink 125 mmc 1 Werkstatthandbuch : Seite 102

Microfiches
Image preview

Seite 100

Image preview

Seite 101

Image preview

Seite 103

Image preview

Seite 104

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220 225 230 235 240 245 249
          8. DRIVE AND DRIVEN PULLEYS/
  KICK STARTER                                                   GRAND DINK 125/150


                                                            Clutch Outer
 Install the clutch outer.
 Hold the clutch outer with the universal
 holder.
 Install and tighten the clutch outer nut.
 Torque: 49.058.8kg-m
 Special
 Universal Holder
 Install the drive belt. ( 8-7)
 Install the left crankcase cover. ( 8-3)


                                                                  Kick Lever
 KICK STARTER
 REMOVAL
 Remove the left crankcase cover. ( 8-3)
 Remove the seal rubber and dowel pins.
 Remove the kick lever.
 Remove the circlip and washer from the kick
 starter spindle.


                                                  Kick Starter Spindle
                                                              Starter Driven Gear
 Gently turn the kick starter spindle to remove
 the starter driven gear together with the
 friction spring.




                                                                   Friction Spring
                                                       Return Spring
 Remove the kick starter spindle and return
 spring from the left crankcase cover.
 Remove the kick starter spindle bushing.




                                                                Kick Starter Spindle

8-15