kxr maxxer 250 300 Werkstatthandbuch : Seite 237

Microfiches
Image preview

Seite 235

Image preview

Seite 236

Image preview

Seite 238

Image preview

Seite 239

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220 225 230 235 240 245 249
          18. STARTING SYSTEM                                                        ATV 300/250

                                                Commutator
 ASSEMBLY
 Apply grease to the dust seal in the front
 cover.
 Install the brushes onto the brush holders.
 Apply a thin coat of grease to the two ends
 of the armature shaft.
 Insert the commutator into the front cover.
 · Be careful not to damage the brush and
     armature shaft mating surfaces.
   · When installing the commutator, the
     armature shaft should not damage the                                  Front Cover
     dust seal lip.
                                                   Tab           Groove       O-ring
 Install a new O-ring to the front cover.
 Install the starter motor case, aligning the
 tab on the motor case with the groove on the
 front cover.
 Tighten the starter motor case screws.
 When assembling the front cover and
   motor case, slightly press down the
   armature shaft to assemble them.

                                                             Motor Case
 STARTER MOTOR INSTALLATION
 Connect the starter motor cable connector                        O-ring
 and properly install the waterproof rubber
 jacket.
 Check the O-ring for wear or damage and
 replace if necessary.
 Apply grease to the O-ring and install the
 starter motor.
 Tighten the two mounting bolts.
 Torque: 1 kgf-m (10 N-m, 7.2 lbf-ft)

 The starter motor cable connector must
   be installed properly.




18-5