mxu 250 300 2 Werkstatthandbuch : Seite 66

Microfiches
Image preview

Seite 64

Image preview

Seite 65

Image preview

Seite 67

Image preview

Seite 68

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220 225 230 235 240 245 250 255 260 265 270 275 280 285 290 295 300 305 310 315 320 325 330 335 340 345 350 352
          3. INSPECTION/ADJUSTMENT                                               MXU 300/250

                                                  Tie-rod End Nuts
 · Be sure that both tie-rod are turned the
     same amount. If not, the machine will
     drift tight or left even though the
     handlebar is positioned straight which
     may lead to mishandling and accident.
   · After setting the toe-in to specification,
     run the machine slowly for some
     distance with hands placed lightly on
     the handlebar and check that the
     handlebar responds correctly. If not,
     turn either the right or left tie-rod
     within the toe-in specification.                                    Tie-rod



 WHEELS/TIRES
 Check the tires for cuts, imbedded nails or
 other damages.
 Check the tire pressure.
 Tire pressure should be checked when
    tires are cold.

 TIRE PRESSURE
                            1 Rider
    Front       0.28 kgf/cm (28 Kpa, 3.2 psi)
    Rear        0.28 kgf/cm (28 Kpa, 3.2 psi)

 TIRE SIZE
 Front : 22*7-10
 Rear : 22*10-10

                                                      Front Axle Nut
 Check the front axle nut for looseness.




3-19