like 50 2T 1 Werkstatthandbuch : Seite 60

Microfiches
Image preview

Seite 58

Image preview

Seite 59

Image preview

Seite 61

Image preview

Seite 62

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 187
          5. ENGINE REMOVAL/INSTALLATION                                LIKE 50 2T

                                              Engine Hanger
 ENGINE HANGER BRACKET
 INSPECTION
 Inspect the stopper rubbers and bushings
 for damage and replace with new ones if
 necessary.




                                                 Bushings     Stopper Rubbers




 ENGINE INSTALLATION
 Install the engine in the reverse order of
 removal.

   Cables and wires should be routed
   properly.

 Torque Values:
 Engine mounting bolt : 4.55.5kg-m
 Rear shock absorber lower mount bolt:
                      : 2.43.0kg-m




 Perform the following inspections and
 adjustments after installation.
 · Throttle cable
 · Oil pump control cable ( 3-11)
 · Rear brake cable ( 3-5)
 · Oil pump bleeding ( 3-11)




                                                                          5-4