zing 125 qe Werkstatthandbuch : Seite 103

Microfiches
Image preview

Seite 101

Image preview

Seite 102

Image preview

Seite 104

Image preview

Seite 105

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 158
          11. FRONT WHEEL/SUSPENSION/
    STEERING                                                                  ZING II 125


 Remove the two handlebar lock nuts to
 remove the handlebar.

 INSTALLATION
 Install the handlebar in the reverse order of
 removal.

 Torque: 0.81.2 kg-m


                                                                       Nuts



                                                                              Hole


 When installing the right and left handlebar
 switch housings, align the pin on the housing
 with the hole in the handlebar. Tighten the
 two switch housing screws.




                                                 Clutch Lever Holder            Pin

                                                    UP Mark                     Hole


 When installing the master cylinder and
 clutch lever holders, align the tab on the
 holder with the hole in the handlebar with
 the holder "UP" mark facing up.
 First tighten the upper bolt and then the
 lower bolt.
 Torque: 1.01.4 kg-m




11-5