mxu 550 exi Werkstatthandbuch : Seite 290

Microfiches
Image preview

Seite 288

Image preview

Seite 289

Image preview

Seite 291

Image preview

Seite 292

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220 225 230 235 240 245 250 255 260 265 270 275 280 285 290 295 300 305 310 315 320 325 330 335 340 345 350 355 360 365 370 375 380 385 390 395 400 405 410 415 420 422
          13. DRIVE TRAIN                                  MXU 55EXi/MXU500i



 INSTALLATION

 Install the front drive case into the frame.

 Install and tighten the two mounting
 bolts/nuts to the specified torque.

 Torque: 4 kgf-m (40 N-m, 29 lbf-ft)




 Install the front propeller shaft.




                                                    Front Propeller Shaft




 Connect all wire connectors and then install.




13-13