people 125 Werkstatthandbuch : Seite 83

Microfiches
Image preview

Seite 81

Image preview

Seite 82

Image preview

Seite 84

Image preview

Seite 85

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 186
          7. CYLINDER HEAD/VALVES                                                PEOPLE 125/150
                                                 Cam Chain        Camshaft Gear
 CAMSHAFT INSTALLATION
 Turn the flywheel so that the "T" mark on the
 flywheel aligns with the index mark on the
 crankcase.
 Keep the round hole on the camshaft gear
 facing up and align the punch marks on the
 camshaft gear with the cylinder head surface
 (Position the intake and exhaust cam lobes
 down.) and install the camshaft onto the
 cylinder head.
 Install the cam chain over the camshaft gear.

                                                    Round Hole         Punch Marks
                                                                 Dowel Pins
 Install the dowel pins.




                                                                 Camshaft Holder
 Install the camshaft holder, washers and nuts
 on the cylinder head.
 Tighten the four cylinder head nuts and two
 bolts.
 Torque: Cylinder head nut: 2.0kg-m
   · Apply engine oil to the threads of the
     cylinder head nuts.
   · Diagonally tighten the cylinder head
     nuts in 2 3 times.


                                                             Washer           Nut
                                                                 Tensioner Screw
 Adjust the valve clearance. ( 3-5)
 Turn the cam chain tension              screw
 counter-clockwise to release it.




7-11